Monthly checks in high-rise residential buildings
In England, the responsible person for a residential building at least 18 metres high or with at least 7 storeys (regulation 3) must do monthly routine checks of firefighting lifts, evacuation lifts and essential fire-fighting equipment, which includes fire detection and fire alarm systems, and keep a record of them (regulation 7).
Next service due 31 Jul 2026.
Any date from 30 Jun 2026 to 31 Aug 2026 is inside the 5 to 7 month window that BS 5839-1:2025 allows after the visit on 31 Jan 2026.
Service visits for the next two years
| Visit | Earliest | Due | Latest | Also at this visit |
|---|---|---|---|---|
| 1 | 30 Jun 2026 | 31 Jul 2026 | 31 Aug 2026 | ARC signals, panel clock, false alarm rate |
| 2 | 31 Dec 2026 | 31 Jan 2027 | 28 Feb 2027 | 12 months on: duct smoke detectors |
| 3 | 30 Jun 2027 | 31 Jul 2027 | 31 Aug 2027 | ARC signals, panel clock, false alarm rate |
| 4 | 31 Dec 2027 | 31 Jan 2028 | 29 Feb 2028 | 12 months on: duct smoke detectors |
Assumes each visit happens on its due date. If your last visit was not a 12-monthly one, the 12-monthly items fall on visits 1 and 3 instead. Every visit checks ARC signals, the panel clock and the false alarm rate.
Weekly call point rotation
With 12 call points, each one is operated once every 12 weeks, so about 4.3 times a year by the weekly test alone.
| Week | Date | Call point | Result | Signature |
|---|---|---|---|---|
| 1 | Mon 23 Nov 2026 | CP 1 | ||
| 2 | Mon 30 Nov 2026 | CP 2 | ||
| 3 | Mon 7 Dec 2026 | CP 3 | ||
| 4 | Mon 14 Dec 2026 | CP 4 | ||
| 5 | Mon 21 Dec 2026 | CP 5 | ||
| 6 | Mon 28 Dec 2026 | CP 6 | ||
| 7 | Mon 4 Jan 2027 | CP 7 | ||
| 8 | Mon 11 Jan 2027 | CP 8 | ||
| 9 | Mon 18 Jan 2027 | CP 9 | ||
| 10 | Mon 25 Jan 2027 | CP 10 | ||
| 11 | Mon 1 Feb 2027 | CP 11 | ||
| 12 | Mon 8 Feb 2027 | CP 12 |
False alarm rate
1 / 40 x 100 = 2.5 false alarms per 100 detectors per year. Under 4 per 100. The servicing engineer still checks the rate at every visit.
Runs in your browser; nothing you type is sent anywhere. England and Wales.
Monthly check dates for 2026
| Month | Test | Date |
|---|---|---|
| 1 | Monthly routine check | Sat 31 Jan 2026 |
| 2 | Monthly routine check | Sat 28 Feb 2026 |
| 3 | Monthly routine check | Tue 31 Mar 2026 |
| 4 | Monthly routine check | Thu 30 Apr 2026 |
| 5 | Monthly routine check | Sun 31 May 2026 |
| 6 | Monthly routine check | Tue 30 Jun 2026 |
| 7 | Monthly routine check | Fri 31 Jul 2026 |
| 8 | Monthly routine check | Mon 31 Aug 2026 |
| 9 | Monthly routine check | Wed 30 Sep 2026 |
| 10 | Monthly routine check | Sat 31 Oct 2026 |
| 11 | Monthly routine check | Mon 30 Nov 2026 |
| 12 | Monthly routine check | Thu 31 Dec 2026 |
Month-end dates fall on the last day of shorter months.
Faults
Regulation 7 also sets out what to do when a fault found in a check cannot be put right quickly, including telling the fire and rescue service. Read the regulation for the exact terms.
Before you rely on these dates
- The rules here come from published summaries of BS 5839-1:2025 by the Fire Industry Association and the IET, and from fire and rescue service log book guidance, each linked on the page it is used. The standard itself is sold by BSI, so the wording on this site is ours.
- The planner works out dates, a rotation and a rate. It does not certify a system or replace a fire risk assessment.
- Your servicing company decides what each visit covers and issues the certificate. If their schedule differs, theirs is the one to follow.
- England and Wales. Scotland and Northern Ireland have their own fire safety law.
Questions
Does this replace the weekly test?
No. The weekly call point test and the six-monthly service still apply. The monthly check is an extra duty for these buildings.