Emergency lighting test schedule
BS 5266-1:2025 came into effect on 31 October 2025 and is used with BS EN 50172:2024 (also numbered BS 5266-8) and BS EN 1838:2024. Emergency lighting tests can be done during a fire alarm service visit.
Next service due 12 Jul 2026.
Any date from 12 Jun 2026 to 12 Aug 2026 is inside the 5 to 7 month window that BS 5839-1:2025 allows after the visit on 12 Jan 2026.
Service visits for the next two years
| Visit | Earliest | Due | Latest | Also at this visit |
|---|---|---|---|---|
| 1 | 12 Jun 2026 | 12 Jul 2026 | 12 Aug 2026 | ARC signals, panel clock, false alarm rate |
| 2 | 12 Dec 2026 | 12 Jan 2027 | 12 Feb 2027 | 12 months on: duct smoke detectors |
| 3 | 12 Jun 2027 | 12 Jul 2027 | 12 Aug 2027 | ARC signals, panel clock, false alarm rate |
| 4 | 12 Dec 2027 | 12 Jan 2028 | 12 Feb 2028 | 12 months on: duct smoke detectors |
Assumes each visit happens on its due date. If your last visit was not a 12-monthly one, the 12-monthly items fall on visits 1 and 3 instead. Every visit checks ARC signals, the panel clock and the false alarm rate.
Weekly call point rotation
With 12 call points, each one is operated once every 12 weeks, so about 4.3 times a year by the weekly test alone.
| Week | Date | Call point | Result | Signature |
|---|---|---|---|---|
| 1 | Mon 23 Nov 2026 | CP 1 | ||
| 2 | Mon 30 Nov 2026 | CP 2 | ||
| 3 | Mon 7 Dec 2026 | CP 3 | ||
| 4 | Mon 14 Dec 2026 | CP 4 | ||
| 5 | Mon 21 Dec 2026 | CP 5 | ||
| 6 | Mon 28 Dec 2026 | CP 6 | ||
| 7 | Mon 4 Jan 2027 | CP 7 | ||
| 8 | Mon 11 Jan 2027 | CP 8 | ||
| 9 | Mon 18 Jan 2027 | CP 9 | ||
| 10 | Mon 25 Jan 2027 | CP 10 | ||
| 11 | Mon 1 Feb 2027 | CP 11 | ||
| 12 | Mon 8 Feb 2027 | CP 12 |
False alarm rate
1 / 40 x 100 = 2.5 false alarms per 100 detectors per year. Under 4 per 100. The servicing engineer still checks the rate at every visit.
Runs in your browser; nothing you type is sent anywhere. England and Wales.
A year of tests from 12 Jan 2026
| Month | Test | Date |
|---|---|---|
| 1 | Monthly functional test | Mon 12 Jan 2026 |
| 2 | Monthly functional test | Thu 12 Feb 2026 |
| 3 | Monthly functional test | Thu 12 Mar 2026 |
| 4 | Monthly functional test | Sun 12 Apr 2026 |
| 5 | Monthly functional test | Tue 12 May 2026 |
| 6 | Monthly functional test | Fri 12 Jun 2026 |
| 7 | Monthly functional test | Sun 12 Jul 2026 |
| 8 | Monthly functional test | Wed 12 Aug 2026 |
| 9 | Monthly functional test | Sat 12 Sep 2026 |
| 10 | Monthly functional test | Mon 12 Oct 2026 |
| 11 | Monthly functional test | Thu 12 Nov 2026 |
| 12 | Annual full rated duration test | Sat 12 Dec 2026 |
Illuminance is measured when the system is installed and every 5 years after that: for this schedule, by 12 Jan 2031.
What each test is
- Monthly: a functional test of each emergency luminaire and exit sign.
- Annually: the same, run for the full rated duration of the system, typically 3 hours. The minimum duration BS 5266 allows is 1 hour.
- Every 5 years: illuminance measurements.
- Record every test date, result and fault in the emergency lighting log book.
Sources: LIA ICEL emergency lighting guide, FPA, NICEIC on BS 5266-1:2025. The standards are sold by BSI; the wording here is ours.
Before you rely on these dates
- The rules here come from published summaries of BS 5839-1:2025 by the Fire Industry Association and the IET, and from fire and rescue service log book guidance, each linked on the page it is used. The standard itself is sold by BSI, so the wording on this site is ours.
- The planner works out dates, a rotation and a rate. It does not certify a system or replace a fire risk assessment.
- Your servicing company decides what each visit covers and issues the certificate. If their schedule differs, theirs is the one to follow.
- England and Wales. Scotland and Northern Ireland have their own fire safety law.
Questions
Can the annual test be done at the fire alarm service?
Yes. Technicians can do it during a fire alarm service visit.